| Floor Profile |
| a) Floor to ceiling height |
2640mm |
| b) Core to window span |
10.6m |
| c) Ceiling grid |
1,200mm |
| d) Slab to soffit |
3,300mm |
|
Air Conditioning
|
| a) Centre zone |
Variable volume (VAV) |
| b) Perimeter zone |
Induction units |
| c) Number of zones per floor |
42 standard, expandable to 66 |
| (d) Design capacity |
i) People 1 person/10m2 |
| |
ii) Lighting (w/m2) 15 |
| |
iii) Tenant Equipment (w/m2) 20 |
| e) Floor by floor capacity after hours |
Yes |
| f) Dedicated Condenser |
Water Capacity (w/m2) 38 |
| g) Ancillary exhaust |
300l/s max per floor |
| h) Ancillary fresh air |
300l/s max per floor |
|
Lifts
|
| a) Type Gearless |
Traction |
| b) Number/Speed |
Low Rise 6 @ 3.5m/s |
| |
Mid Rise 6 @ 5.0m/s |
| |
High Rise 6 @ 6.0m/s |
| |
Sky Rise 6 @ 7.0m/s |
| c) Capacity (passenger) |
1564kg/1364kg |
| d) Goods Lifts/Speed |
1 @ 2.5m/s |
| e) Capacity (goods) |
1635kg |
| f) Standby Goods Lift |
Yes |
|
Artificial Lighting
|
| a) Average in open office areas |
600 lux |
|
Security
|
| a) Security desk in lobby staffed 24 hours/7 days |
Yes |
| b) Concierge desk staffed 8.00am to 6.00pm 5 days |
Yes |
| c) Proximity access control |
Yes |
| d) Surveillance camera monitoring of lifts, public areas, and car park |
Yes |
|
Power Reticulation
|
| a) Power into building |
3 substations 11kv triple grid |
| b) Service duct capacity |
Yes |
| c) Reticulation around floors |
3 channel perimeter ducting |
| d) Emergency power |
Diesel generators serving essential standby and tenant services |
| e) Submains to office floors |
80VA/m2 to a maximum of 120VA/m2 |
|
Communications
|
| a) Number of telephone lines per floor |
200 |
| b) Dedicated tenant riser space |
Extensive |
| c) Reticulation around floors |
Dedicated communication cable trays and catenary wires extending from service corridor to perimeter of floor |
| d) Satellite capability |
Yes |
| e) Microwave capability |
Yes |
| f) Fibre optic capability |
Yes |
|
|